• Capacitor Voltage Transformer
  • Capacitor Voltage Transformer
Capacitor Voltage Transformer
Capacitor Voltage Transformer

Capacitor Voltage Transformer

The production models of voltage transformers include capacitive voltage transformers (CVT) and electromagnetic voltage transformers (PT or VT).

PRODUCT DETAILS

The production models of voltage transformers include capacitive voltage transformers (CVT) and electromagnetic voltage transformers (PT or VT).

Capacitive voltage transformers (CVT) are the mainstream products of current outdoor power stations. They are used in power systems with rated voltages of 35kV~1000kV and rated frequencies of 50 Hz. They proportionally convert the high voltage on the primary line into a standard low voltage value (100 V, 100/√3 V or 100/3 V), making measuring instruments and relays miniaturized and standardized.

Capacitive voltage transformers are mainly composed of two parts: a capacitive voltage divider and an electromagnetic unit.

The capacitive voltage divider consists of multiple series capacitors, which are sealed in an insulating sleeve and filled with insulating oil. According to a certain ratio, taps are set up inside the capacitive voltage divider to divide it into a high-voltage capacitor area C1 and a medium-voltage capacitor area C2. The high-voltage capacitor area (larger capacitive reactance) withstands the high voltage from the primary system, while the medium-voltage capacitor area (smaller capacitive reactance) obtains a lower voltage. According to the voltage division principle of series capacitors in the circuit principle, the voltage Uc measured in the medium-voltage capacitor area (at the tap) can be converted into the voltage (primary system voltage) borne by the entire capacitor voltage divider through the following relationship: Un=Uc*K; where K=(C1+C2)/C1

The electromagnetic unit is used to measure the voltage value divided by the medium-voltage capacitor area, and a medium-voltage transformer is installed at the medium-voltage capacitor tap. The medium-voltage transformer, the compensating reactance and the damping element form the electromagnetic unit, which is packaged together in the oil tank at the bottom of the CVT bushing. The structure and oil circuit are independent of the capacitor voltage divider.

Product Parameters

Products TYD35/√3 0.02HF TYD66/√3-0.02HF TYD90/√3-0.02H TYD115/√3-0.01H TYD115/√3-0.02H TYD132/√3 0.01H TYD132/√3 0.02H TYD230/√3 0.005H TYD230/√3 0.01H TYD400/√3-0.005H TYD500/√3-0.005H TYD765/√3-0.005H TYD1000/√3-0.005H
Maximum voltage (kV) 40.5 72.5 100 126 126 145 145 245 245 420 550 800 1100
Rated frequency 50Hz 50Hz 50Hz 50Hz 50Hz 50Hz 50Hz 50Hz 50Hz 50Hz 50Hz 50Hz 50Hz
Rated capacitance (Pf) 20000 20000 20000 10000 20000 10000 20000 5000 10000 5000 5000 5000 5000
Rated voltage coefficient/time 1.2/continuous 1.9/8h 1.2/continuous 1.9/8h 1.2/continuous 1.3/30s 1.2/continuous 1.3/30s 1.2/continuous 1.3/30s 1.2/continuous 1.3/30s 1.2/continuous 1.9/8h 1.2/continuous 1.9/8h 1.2/continuous 1.3/30s 1.2/continuous 1.3/30s 1.2/continuous 1.3/30s 1.2/continuous 1.3/30s 1.2/Continuous 1.3/30s 1.2/Continuous 1.3/30s
Rated power frequency withstand voltage (kV) 95 160 185 230 230 275 275 460 460 630 740 975 1200
Rated lightning impulse withstand voltage (kV) 200 350 450 550 550 650 650 1050 1050 1450 1675 2100 2400
Rated switch pulse withstand voltage (kV) / / / / / / / / / 1050 1300 1550 1800
Partial discharge Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5 Less than or equal to 5
Secondary winding (1a-1n) Accuracy level 0.2 level/0.5 level 0.2 level/0.5 level 0.2 level/0.5 level 0.2 level/0.5 level 0.2 level/0.5 level 0.2 level/0.5 level 0.2 level/0.5 level 0.2 level/0.5 level 0.2 level/0.5 level 0.2 level/0.5 level 0.2 level/0.5 level 0.2 level/0.5 level
Load Less than or equal to 50 Less than or equal to 50 Less than or equal to 50 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 50
Secondary winding (2a-2n) Accuracy level 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P
Load Less than or equal to 50 Less than or equal to 50 Less than or equal to 50 Less than or equal to 50 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 50
Secondary winding (3a-3n) Accuracy level 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P
Load Less than or equal to 50 Less than or equal to 50 Less than or equal to 50 Less than or equal to 50 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 50 Less than or equal to 100 Less than or equal to 50 Less than or equal to 50
Secondary winding (Da-Dn) Accuracy level 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P 0.5 level/3P
Load Less than or equal to 100 Less than or equal to 100 less than or equal to 100 less than or equal to 100 less than or equal to 100 less than or equal to 100 less than or equal to 100 less than or equal to 100 less than or equal to 100 less than or equal to 100 less than or equal to 100 less than or equal to 100 less than or equal to 100
Weight (kg) 460 530 530 580 580 640 640 800 880 1200 1500 3400 6700

FACTORY WORKSHOP

Factory
Factory
Factory
Factory
Factory
Factory

CUSTOMER VISIT

Customer Photo
Customer Photo
Customer Photo
Customer Photo
Customer Photo
Customer Photo
Customer Photo
Customer Photo
Customer Photo
Customer Photo

CERTIFICATE

Green design product management system evaluation certificate

Green design product management system evaluation certificate

Energy Management System Certification Certificate Attachment

Energy Management System Certification Certificate Attachment

Green Power Application Management System Evaluation Certificate

Green Power Application Management System Evaluation Certificate

Energy Management System Certification Certificate

Energy Management System Certification Certificate

Energy Management System Certification Certificate

Energy Management System Certification Certificate

Shandong Taikai Electric Power Co., Ltd.---Green Factory

Shandong Taikai Electric Power Co., Ltd.---Green Factory

APPLICATION FIELD

Application

Application

Application

Application

Application

Application

Application

Application

FAQ

How can we guarantee quality?

How can we guarantee quality?

Always a pre-production sample before mass production;</br>
Always final Inspection before shipment;</br>
Please feel free to leave us message if you have any question about us and our products.
Always a pre-production sample before mass production;
Always final Inspection before shipment;
Please feel free to leave us message if you have any question about us and our products.
How long is your delivery time?

How long is your delivery time?

Generally speaking, our delivery time is within 15-45 days, if the demand is particularly large or there are special circumstances, the delivery time may be delayed.
Generally speaking, our delivery time is within 15-45 days, if the demand is particularly large or there are special circumstances, the delivery time may be delayed.
Can we visit your factory?

Can we visit your factory?

Warmly welcome.  Once we have your schedule, we will arrange the professional sales team to follow up your case.
Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
About the product price?

About the product price?

Due to the cyclical changes in raw material prices, prices vary from period to period.  You can consult us, you can communicate with us online through the platform, WeChat, WhatsApp and other platforms, and we will reply within 24 hours.  Please give us your requirements and specifications (steel grade, size, quantity, destination port), and we will work out the best price at the first time.
Due to the cyclical changes in raw material prices, prices vary from period to period. You can consult us, you can communicate with us online through the platform, WeChat, WhatsApp and other platforms, and we will reply within 24 hours. Please give us your requirements and specifications (steel grade, size, quantity, destination port), and we will work out the best price at the first time.
Can you arrange the shipment?

Can you arrange the shipment?

Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Can you provide sample?

Can you provide sample?

Yes, for regular sizes sample is free but buyer need to pay freight cost.
Yes, for regular sizes sample is free but buyer need to pay freight cost.

GET A FREE QUOTE

Shandong Taikai Electric Power Co., Ltd.

Apply For Discount !

24 Hours Online Service

Provide You With Free Industry Solutions

Quality Assurance

%{tishi_zhanwei}%